Full traceability
Every serialised part must be traceable to its material lots, inspections and deliveries.
aerospace quality management software
Aerospace work demands traceability of every part and material, rigorous nonconformance control and proof that people and gauges were qualified. QCIN keeps those records connected.
Every serialised part must be traceable to its material lots, inspections and deliveries.
Suspect material must be identified, segregated and dispositioned with a record.
Auditors check that inspectors were trained and gauges calibrated on the day of work.
Forward and backward trace up to 15 levels, including supplier lots and shipments.
Use-as-is, rework, repair, scrap and return-to-supplier decisions with cost and evidence.
Gauge register with due dates and certificates; out-of-calibration gauges are blocked from use.
Skill matrix with training records and certificate expiry.
Versioned procedures and work instructions with approval and acknowledgment.
CoA review, incoming inspection and supplier scorecards.
QCIN supports processes AS9100 builds on — traceability, nonconformance control, calibration, competence, document control and audits — but it is not AS9100 certified and has no built-in AS9102 FAI forms.
Yes, lots, batches, serials and materials are supported, and the genealogy shows which inspections, NCRs and complaints relate to each.
During inspections, measurement steps only accept gauges that are in calibration.
FAI forms are not a QCIN module; completed FAI reports can be stored and version-controlled in Document Control.
Start a free 14-day trial — no card required — or book a walkthrough with our team.